[bldg-sim] Simulation of Ice Storage in Equest
Gang Wu
gangwu1 at yahoo.com
Tue Dec 6 02:03:45 PST 2005
David,
Thank you for your input. I created a Equipment Control and put a ice-making chiller under it for ice-build specifically. Also I had another Equipment Control for discharging and chiller use. I put the two Equipment Controls under a Load Management that manages the two control scenarios using different control flags. I am not quite sure if my above practice is correct. Please advise.
Thank you in advance.
Glenn
David S Eldridge <DSE at grummanbutkus.com> wrote:
Make two separate chillers, and have them scheduled for availability such that the one with the performance curves for ice is available during your ice-build times, and the "standard" performance machine is available during other times.
I haven't looked at an ice-building performance curve yet, but even if the curves are similar, the EIR and capacity for the two cases will be different.
Hope this helps!
David
--------------------------------------------------------------
David S. Eldridge, Jr.
Project Engineer
LEED v2.0 Accredited Professional
Grumman/Butkus Associates
820 Davis St., Suite 300
Evanston, IL 60201
847.328.3555 ext. 224
dse at grummanbutkus.com
-------------------------------------------------------------
---------------------------------
From: bldg-sim at gard.com [mailto:bldg-sim at gard.com] On Behalf Of Gang Wu
Sent: Sunday, December 04, 2005 8:33 PM
To: bldg-sim at gard.com
Subject: [bldg-sim] Simulation of Ice Storage in Equest
Hi folks,
I am simulating a partial ice-storage system using Equest. One of the
chillers in the plant has to operate under low temperature to make ice
during off-peak hours, while during on-peak hours it runs under high
temperature to supply chilled water to coils. To my knowledge it shoulf
be a dual-condition chiller, screw or centrifugal type.
I am wondering how I can model this dual-condition chiller in Equest.
Can one performance curve represent the chiller's performance of making
both ice and chilled water? If my understanding is correct, each
chiller in Equest can only be assigned with one performance curve.
I highly appreciate if any expert provide some successful examples of
both ice-storage simulation and that dual-condition chiller curve.
Best,
Glenn Wu
---------------------------------
Yahoo! Personals
Skip the bars and set-ups and start using Yahoo! Personals for free
=====================================================You received this e-mail because you are subscribed to the BLDG-SIM at GARD.COM mailing list. To unsubscribe from this mailing list send a blank message to BLDG-SIM-UNSUBSCRIBE at GARD.COM
---------------------------------
Yahoo! Personals
Skip the bars and set-ups and start using Yahoo! Personals for free
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20051206/c1116fcd/attachment-0002.htm>
More information about the Bldg-sim
mailing list