Hi (again),

I'm sizing some solar hot water panels for a project (solar heat for an
indoor pool).  When choosing the number of panels, I discovered something
curious:

After I get up to about 65% solar energy for the system, the efficiency of
adding new panels drops off.  For example, the first panel provides
2.66MBtu, but the 33rd only
2.00 MBtu.  Is this because I've reached the point where the panels are too
big for the load some of the time??  I assume this could be improved by
adding thermal storage.

Thanks,


-- 
Karen Walkerman
Second Law Consulting
802-238-0980
kwalkerman at gmail.com


======================================================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20070808/39ec1756/attachment.htm>


More information about the Bldg-sim mailing list