All:
 
ASHRAE 90.1-2004 has design criteria for Equipment capacities on Page
176 of the Standard (G3.1.2.2). It talks about Unmet load hours on the
proposed design AND the baseline design not exceeding 300 hrs (of 8,760
Hrs), and the delta between base and proposed not differing more than 50
hours.
 
Is this WHOLE BUILDING, or BY ZONE? I have 76 zones in my building, and
to play the Unmet loads game between these two models is harder than
trying to hold water in my hands.
 
Any thoughts, interpretations, or suggestions?
 
John R. Aulbach, PE, CEM
Project Manager
Nexant, Inc.
100 North Barranca, Suite 820
West Covina, CA 91791 USA
Phone: 626-430-9054
Fax: 626-430-9060
email: jaulbach at nexant.com
 
 
 


===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20070706/2b96c605/attachment-0002.htm>


More information about the Bldg-sim mailing list