We are evalulating energy savings from an IDEC system for a LEED office
building with eQUEST, and ran into a huge gas penalty. To maximize the
savings, all supply air passes through the IDEC system. Our conversations
with other modelers indicated many of them had similar problem. I was
wondering if there is a good explanation for this gas consumption increase
and whether there is a right way to simulate the IDEC if the gas penalty is
a bug. Thanks.
Xiang
*Nexant, Inc.*
1401 Walnut St., Suite 400
Boulder, CO 80302
Ph: (303) 998-2474
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20070611/e7d27497/attachment.htm>
More information about the Bldg-sim
mailing list