For LEED purposes, the EAP2 requirement will be met by certifying that
you meet the mandatory requirements in the standard, and any one of:

 

1)      Prescriptive compliance with standard

2)      Performance compliance with standard (ECB)

3)      Earning at least one point through EAC1

 

Now, it is a different question whether your local building code
official will accept the "one or more EAC1 points" point argument, along
the lines of what you've pointed out.

 

 

 

 

 

 

From: BLDG-SIM at gard.com [mailto:BLDG-SIM at gard.com] On Behalf Of Peter
Alspach
Sent: Monday, November 12, 2007 4:14 PM
To: BLDG-SIM at gard.com
Subject: [BLDG-SIM] LEED EA Prerequisite 1 and eQUEST

 

It is my understanding that what you state below is not actually
correct. demonstrating savings via Appendix G does not demonstrate
compliance with the standard. If you do not meet the mandatory
provisions you do not meet the prerequisite. If you do not meet the
prescriptive requirements then officially you need to demonstrate
compliance via the ECB method (chapter 11) in a pass/fail mode. 

 

provided you pass, then you use Appendix G to demonstrate savings.

 

all - correct me if I am wrong here.

 

Peter

 

________________________________

From: BLDG-SIM at gard.com [mailto:BLDG-SIM at gard.com] On Behalf Of Vikram
Sami
Sent: Monday, November 12, 2007 12:28 PM
To: BLDG-SIM at gard.com
Subject: [BLDG-SIM] LEED EA Prerequisite 1 and eQUEST

Thanks to everyone for weighing in on this. It  turns out my question
regarding LEED was a little premature - you can use your Appendix G
documentation for this.

 

Which brings up the question - given that LEED now requires a minimum of
2 energy reduction credits to be earned, what's the point of the
prerequisite documentation? 

 

Vikram Sami, LEED AP 
Direct Phone 404-253-1466 | Direct Fax 404-253-1366 

LORD, AECK & SARGENT ARCHITECTURE
1201 Peachtree Street NE, Suite 300, Atlanta, GA 30361 
Responsive Design * Technological Expertise * Exceptional Service 
www.lordaecksargent.com 

Please don't print this email unless you really have to. 
In the United States, we use enough office paper each year to build a
10-foot high wall that's 6,815 miles long or two and a half times the
distance from New York to Los Angeles. 

~ Wisconsin Department of Natural Resources, "Recycling Facts and
Figures," PUBL CE-163, 2002. 

 

 

________________________________

From: BLDG-SIM at gard.com [mailto:BLDG-SIM at gard.com] On Behalf Of Aulbach,
John
Sent: Monday, November 12, 2007 2:55 PM
To: BLDG-SIM at gard.com
Subject: [BLDG-SIM] LEED EA Prerequisite 1 and eQUEST

Vik:

 

eQuest in its present form only can develop California Title 24 forms.
There IS a 90.1 Version in the works, but it is not yet available. Stay
tuned.

 

________________________________

From: BLDG-SIM at gard.com [mailto:BLDG-SIM at gard.com] On Behalf Of Doug
Gwaltney
Sent: Monday, November 12, 2007 11:15 AM
To: BLDG-SIM at gard.com
Subject: [BLDG-SIM] LEED EA Prerequisite 1 and eQUEST

Vik,

 

I believe eQUEST will only produce overall performance for Title 24 not
the prescriptive forms.

 

Doug Gwaltney

Barrett, Woodyard & Associates

770.810.8800 Office   678.301.2235 Direct

770.810.8808 Fax

 

________________________________

From: BLDG-SIM at gard.com [mailto:BLDG-SIM at gard.com] On Behalf Of Vikram
Sami
Sent: Monday, November 12, 2007 11:31 AM
To: BLDG-SIM at gard.com
Subject: [BLDG-SIM] LEED EA Prerequisite 1 and eQUEST

Has anyone used eQUEST to document the EA prerequisite (compliance with
90.1 or other codes)? I suspect eQUEST does not do that for anything
other than Title 24 - am I correct? 

Vikram Sami, LEED AP 
Direct Phone 404-253-1466 | Direct Fax 404-253-1366 

LORD, AECK & SARGENT ARCHITECTURE
1201 Peachtree Street NE, Suite 300, Atlanta, GA 30361 
Responsive Design * Technological Expertise * Exceptional Service 
www.lordaecksargent.com <file:///\\www.lordaecksargent.com>  

Please don't print this email unless you really have to. 
One tree makes 16.67 reams of copy paper or 8,333.3 sheets
~Conservatree, September 2002

 

==================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
==================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
 
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
 
==================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
____________________________________________________________
Electronic mail messages entering and leaving Arup  business
systems are scanned for acceptability of content and viruses
 
 
==================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM


===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20071112/8caa5423/attachment.htm>


More information about the Bldg-sim mailing list