[BLDG-SIM] Light Tubes in eQuest

JRR Energy.wwind at cox.net
Sat Nov 10 11:55:29 PST 2007


JRR wrote;

How about modeling the equipment space / unattic as an   unheated??   
4th floor ??

Aulbach, John wrote:

> 
>Hi Folks:
>
>Fun for a Friday afternoon (in California).
>
>I have been asked to model light tubes in a 3 story building, but only
>for the top floor (GOOD).
>
>However, there is a slanted roof/spacial area above the 3rd floor
>ceiling. So I cannot directly install a skylight into the top floor
>(BAD).
>
>Any suggestions?
>
>Thanks in advance.
>
>John R. Aulbach, PE, CEM
>Project Manager
>Nexant, Inc.
>100 North Barranca, Suite 820
>West Covina, CA 91791 USA
>Phone: 626-430-9054
>Fax: 626-430-9060
>email: jaulbach at nexant.com
> 
>
>====================================================
>You received this e-mail because you are subscribed 
>to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
>from this mailing list send a blank message to 
>BLDG-SIM-UNSUBSCRIBE at GARD.COM
>
>
>
>  
>


======================================================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM



More information about the Bldg-sim mailing list