[Bldg-sim] eQuest Loads unmet

Lam, Linda linda.lam at sf.fk.com
Tue Feb 12 10:04:58 PST 2008


Hello All-

 

I'm filling out the template for LEED EA credit 1 and I need to know
where to find the total number of hours during which cooling and heating
loads are unmet.  I know in the detailed simulation output BEPS, the
following is given:

 

PERCENT OF HOURS ANY SYSTEM ZONE OUTSIDE OF THROTTLING RANGE =  0.6

PERCENT OF HOURS ANY PLANT LOAD NOT SATISFIED                =  0.0

 

How do I convert that to a number of hours instead of a percent?

 

I also noted that the SS-F report gives undercooled and underheated
hours for each of my zones... Can I avoid going through each of my zones
and adding up the hours? (I have many zones)

 

Thanks!!

 

Linda Lam

  FLACK + KURTZ

405 Howard St.

Suite 500

San Francisco, CA 94105

http://www.flackandkurtz.com <http://www.flackandkurtz.com/>   

415.398.3833 Main

415.402.5813 Direct

415.433.5311 Fax
linda.lam at sf.fk.com

Ensuring that today's built environment preserves the natural
environment in which we live.

This e-mail may contain confidential and/or privileged information. If
you are not the intended recipient (or have received this e-mail in
error) please notify the sender immediately and destroy this e-mail.
Any unauthorized copying, disclosure or distribution of the material in
this email is strictly forbidden.

 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080212/7c93ff38/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 837 bytes
Desc: image001.gif
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080212/7c93ff38/attachment.gif>


More information about the Bldg-sim mailing list