Does anyone know if USGBC is allowing credit for CO Control of parking
garage ventilation?  If anyone has any experience with successfully getting
credit for this efficiency measure can you please let me know.  I am curious
what is considered a reasonable baseline.
 
Thanks in advance.
 
Mike
 
 
Michael Tillou, PE, LEED
Tillou Engineering, LLC
Williamstown, MA 01267
P: 413-458-9870 C: 413-652-1087
 

  _____  

From: bldg-sim-bounces at lists.onebuilding.org
[mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Kevin Kyte
Sent: Tuesday, February 12, 2008 1:25 PM
To: 'Howe, Timothy'; bldg-sim at lists.onebuilding.org
Subject: Re: [Bldg-sim] Metal Building R-19 cavity insulation U-factor



This may help.

 

http://www.maconline.org/designalert.PDF

 

 

 

Kevin Kyte, LEED AP

RobsonWoese, Inc.

(T) 716-636-1800

(F) 716-636-1856

 <http://robsonwoese.com/index.php> http://robsonwoese.com

 

From: bldg-sim-bounces at lists.onebuilding.org
[mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Howe, Timothy
Sent: Tuesday, February 12, 2008 1:07 PM
To: bldg-sim at lists.onebuilding.org
Subject: [Bldg-sim] Metal Building R-19 cavity insulation U-factor

 

I have a metal building wall construction with R-19 insulation between the
girts.

 

Now in ASHRAE 90.1-2004 Appendix A, Table A3.2 the single layer of mineral
fiber only goes up to R-13.

 

Any suggestion on how to determine the U-Factor for this wall?

 

Thanks.

 

Tim.

 

 

 

Timothy Howe
Mechanical Engineer
Stantec

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080212/6cbf81e5/attachment-0001.htm>


More information about the Bldg-sim mailing list