[Bldg-sim] Supply temperature reset in ASHRAE baseline

yizhao1 at vt.edu yizhao1 at vt.edu
Thu Feb 28 18:11:40 PST 2008


The one in the zone  level appear to be for baseboard control.


Quoting "Aulbach, John" <jaulbach at nexant.com>:

> Isn't Package VAV a Terminal System? The reheat coil control should on
> the ZONE Level, not the SYSTEM level.
>
> I think..
>
> -----Original Message-----
> From: bldg-sim-bounces at lists.onebuilding.org
> [mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of
> yizhao1 at vt.edu
> Sent: Thursday, February 28, 2008 5:00 PM
> To: bldg-sim at lists.onebuilding.org
> Subject: [Bldg-sim] Supply temperature reset in ASHRAE baseline
>
> Hi -
> In the baseline, ASHRAE requires a supply air temperature reset for
> system 5, packaged rooftop VAV w/ reheat (G3.1.3.12). In the air side
> system level, I can set up a schedule for cool control, but heat control
> is in grey.
> Does anyone know how to input the reset in the system? Economizer is
> inlcuded.
>
> Thanks!
>
> Ying
>
> _______________________________________________
> Bldg-sim mailing list
> http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org
> To unsubscribe from this mailing list send  a blank message to
> BLDG-SIM-UNSUBSCRIBE at ONEBUILDING.ORG
>
>





More information about the Bldg-sim mailing list