[Bldg-sim] Equest 3.6 Simulation of Campus Chilled Water Meter

David S Eldridge DSE at grummanbutkus.com
Sat Mar 8 10:52:31 PST 2008


Make sure you are looking at comparable reports - the chilled water
demand should be the same in the two cases, but the purchased energy
will be quite different as in one case you are purchasing the chilled
water btu's directly, the other you are purchasing electricity to
produce CHW at some COP, so the two quantities will be different by that
ratio.

David

> -----Original Message-----
> From: bldg-sim-bounces at lists.onebuilding.org [mailto:bldg-sim-
> bounces at lists.onebuilding.org] On Behalf Of Brett Krug, PE
> Sent: Friday, March 07, 2008 4:10 PM
> To: bldg-sim at lists.onebuilding.org
> Subject: [Bldg-sim] Equest 3.6 Simulation of Campus Chilled Water
Meter
> 
> I have been struggling with an issue on a large campus energy model.
I am
> trying to model the chilled water system, which is a campus system
simply as
> metered energy.  I have basically indicated a chilled water meter of
the
> chilled water loop.  My problem is that when I simply replace a
chiller with
> the chilled water meter and re-run the model my space cooling energy
> consumption goes up dramatically (over 2 times).  I have been working
on
> this for a long time, and cannot seem to figure out what is causing
the
> chilled water meter to (virtually) create additional chilled water
energy
> consumption on the chilled water loop.
> 
> Does anyone have familiarity with this issue?