[Bldg-sim] Process Load Points Allowance

Kevin Kyte KKyte at watts-ae.com
Fri Dec 4 06:25:44 PST 2009


At USGBC.org, a CIR submitted 5/26/09 approvingly says that now projects are eligible to claim more than 4 points EA1 Credit through process energy efficiency savings and references a date 10/15/09.  I am unable to find any document with this date.
Is this notice posted somewhere other than the CIR page?
What is the new maximum EA1 point eligibility for process energy efficiency savings?


Thank you,


Kevin Kyte, LEED (r) AP
Watts Architecture & Engineering, P.C.
95 Perry Street, Suite 300
Buffalo, NY  14203
p:  716.206.5174
f.:  716.206.5199
e:   kkyte at watts-ae.com<mailto:kkyte at watts-ae.com>
http://www.watts-ae.com<http://www.watts-ae.com/>



-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20091204/ed953d3a/attachment.htm>


More information about the Bldg-sim mailing list