[Bldg-sim] 2 pipe system in equest
Matt McCalla
mmccalla at oaconsulting.com
Mon Dec 7 17:00:25 PST 2009
I am simulating a 2 pipe system and I am having trouble with the
schedules. Has anyone simulated a 2 pipe system?
The problem I am having is that the output is showing space cooling
during all 12 months and heating only 4 months.