To further complicate things, the target footcandle level of the daylight harvesting system will vary depending on whether the space uses tasks lights or not.  With task lights, the overhead lighting system can be configured to provide an even lower target footcandle level.  I don't know the correct answer, but I've always used 30 footcandles for the target lighting level in typical office projects (most of them have task lights).  If it's a GSA project, where they are very specific about the required workspace lighting levels, you might need to use predefined owner requirements for the target levels...

 

GHT Limited
James Hansen, PE, LEED AP

Senior Associate

1010 N. Glebe Rd, Suite 200

Arlington, VA  22201-4749

703-338-5754 (Cell)

703-243-1200 (Office)

703-276-1376 (Fax)

www.ghtltd.com <http://www.ghtltd.com/> 

 

From: bldg-sim-bounces at lists.onebuilding.org [mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Jonathan Catterall
Sent: Tuesday, June 30, 2009 9:03 AM
To: bldg-sim at lists.onebuilding.org
Subject: [Bldg-sim] 90.1 Appendix G: Daylight Utilization

 

Building-Sim users,

 

Perhaps somebody could shed some light on this issue for me.

 

In 90.1 Appendix G, Table G3.1, Section 6.f. states that credit can be taken in the proposed building for automatic controls due to daylight utilization. However:

*	In order to know how much of an effect daylight should have on the power used, a target luminance/lux level is required. If this target is met by daylight alone, the lighting consumption would drop to 0 (except for emergency lighting). Where daylight falls between 0 and the target lux level, lighting power can be scaled linearly.

*	The documentation gives no target lux levels and they cannot be derived from the baseline lighting power densities (from 90.1 Sections 9.5.1/9.6.1) without knowing the efficiencies associated with these values.

*	The only related luminance levels available are from the IESNA Lighting Handbook but these levels do not seem to sensibly correlate with the power densities of 90.1 Sections 9.5.1/9.6.1.  Take, for example, a drafting office.  The IESNA Lighting Handbook Section 10, Quality of the Visual Environment, suggests a lighting level of around 100fc (1076 lux).  Achieving this 100 fc with an LPD of 1.1W/ft² (11.83W/m²), i.e. that quoted for an Open Plan Office, requires a lamp with an efficiency of approximately 91 lumens/watt.  Using the same Lighting Power Density, and illuminance of 30fc for simple office tasks, we require lights that produce 27 lumens/watt.  This gives us two spaces that are classified identically, but are subject to massively different limitations when it comes to selecting lamps.

Could somebody please provide some clarification on whether it is wise to assume these lux levels while performing a Building Performance Method simulation, bearing in mind that it could affect results in an unfavourable way if lux level is overestimated (as LPD will be constant in the baseline buildings).

 

Regards,

 

Jonathan Catterall

 

  <http://www.edsl.net/> 

Jonathan Catterall
BSc (Hons) Dunelm, MSc
Software Developer

jonathan at edsl.net <mailto:jonathan at edsl.net> 
Tel: +44 (0)1908 261461
http://www.edsl.net <http://www.edsl.net/> 

 

 


The information contained in this communication is confidential, may be privileged, and is intended only for the use of the addressee.  It is the property of GHT Limited.  Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful.  If you have received this communication in error, please notify me immediately by return e-mail or by e-mail to ght at ghtltd.com, and destroy this communication and all copies thereof, including all attachments.  Thank you.



-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20090630/463bc4e8/attachment-0002.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 3003 bytes
Desc: image001.gif
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20090630/463bc4e8/attachment-0002.gif>


More information about the Bldg-sim mailing list