[Bldg-sim] walk in cooler

Jorge Torres-Coto jtorres-coto at mbo1.com
Fri Feb 25 07:00:23 PST 2011


You probably need to use some of the archived eQUEST releases:

 

Download a <http://www.doe2.com/download/equest/eQUEST_v3-61b_Setup.exe>
complete eQUEST version 3.61b installation

 

Download <http://www.doe2.com/download/equest/eQUEST_3-55_Refrig-Add-On.exe>
the eQUEST version 3.55 refrigeration version add-on

 

 <http://doe2.com/download/DOE-22/DOE22Vol2r-DictionaryRefrigeration.pdf>
Volume 2R: DOE-2.2 Language Dictionary: Refrigeration Version

 

These are made to work on refrigeration (i.e. cold rooms), and should avoid
the below 55°F issue

 

Jorge E. Torres Coto   

4830 Viewridge Ave.

San Diego, CA 92123

p              858.751.0933

f               858.751.0937

c              858.688.6088



  _____  

From: bldg-sim-bounces at lists.onebuilding.org
[mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Jeff Haberl
Sent: Thursday, February 24, 2011 5:31 PM
To: Hussein Abaza; bldg-sim at lists.onebuilding.org
Subject: Re: [Bldg-sim] walk in cooler

 

Hussein,

 

I had this problem in 1985 when we simulated an ice rink with DOE-2. This
was documented in the paper:

 

Haberl, J., Claridge, D. 1985. “Retrofit Energy Studies of a Recreation
Center,” ASHRAE Transactions-Research, Vol. 91, Pt. 2, pp.

1421 - 1433 (June).

 

We seemed to be able to estimate the answer by raising the "A" in the "U x A
x delta T" expression that relates to the conduction. A similar expression
could be used to account for the heat gain from the
infiltration/ventilation...

 

jeff

 

8=!  8=)  :=)  8=)  ;=)  8=)  8=(  8=)  8=()  8=)  8=|  8=)  :=')  8=)8=?

Jeff S. Haberl, Ph.D.,P.E., FASHRAE..............jhaberl at tamu.edu

Professor............................................................Office
Ph: 979-845-6507

Department of Architecture.............................Lab Ph:979-845-6065

Energy Systems Laboratory.............................FAX: 979-862-2457

Texas A&M University.....................................77843-3581

College Station, Texas, USA, 77843..................URL:www.esl.tamu.edu

8=/  8=)  :=)  8=)  ;=)  8=)  8=()  8=)  :=)  8=)  8=!  8=)  8=? 8=)8=0

  _____  

From: bldg-sim-bounces at lists.onebuilding.org
[bldg-sim-bounces at lists.onebuilding.org] on behalf of Hussein Abaza
[ahussein at spsu.edu]
Sent: Wednesday, February 23, 2011 3:43 PM
To: bldg-sim at lists.onebuilding.org
Subject: [Bldg-sim] walk in cooler

hello;
I am trying to simulate a walk in cooler in eQuest, but the zone entering
supply air temperature under coil capacity/control, cooling control and
reset is not allowing me to enter value below 55F. I need to set it up to 25
F. is there a way to overcome this problem. 
thank you for your help
H. Abaza
-- Original Message -----
From: "Daniel O'Carroll" <daniel.ocarroll at burgessniple.com>
To: "bldg-sim at lists.onebuilding.org" <bldg-sim at lists.onebuilding.org>
Sent: Wednesday, February 23, 2011 1:27:29 PM GMT -05:00 US/Canada Eastern
Subject: [Bldg-sim] eQuest Training Columbus, Ohio

 

Intermediate - Advanced eQuest Workshop: Whole Building Analysis using
eQUEST 
March 23rd: 10am – 5pm; March 24 - 25th: 8am – 5pm

Dublin Entrepreneurial Center (please visit  <http://www.cgbf.org>
www.cgbf.org for map & directions to the venue), Dublin, Ohio

 

Instructor: Marlin S. Addison, Principal, M.S. Addison & Associates, Tempe,
Arizona, and Clinical Assistant Professor, College of Design, Arizona State
University. Mr. Addison is a nationally recognized expert in building energy
analysis and eQuest.

Lunch included (please email any dietary preference to meera at cgbf.org)

 

AIA HSW CEUs and PDU credits offered for the three-day program (partial
credits are not available)

 

Topics covered include:

Wizard versus Detailed Interface, Strategies and Issues

Detailed Interface Basics: create, copy, rename, delete components, user
defaults & linked components

Detailed Interface Essentials: Opaque Constructions, Schedules (including
priorities among HVAC

related schedules), Glass Types, Geometry, Shading, Parameters, Expressions,
Parametric Processing

Additional LEED Analysis issues using eQUEST

DOE-2 simulation methodology basics

Daylighting

Utility Tariffs, Meters

Life-Cycle Costing in eQUEST

Quality Control Procedures and eQUEST/DOE-2.2 Results Reporting, Hourly
Reports

Modeling Air-side and Water-Side HVAC

HVAC Sizing Issues (air-side and water-side, design days)

OA and Exhaust, Demand Control Ventilation

Ground Source Heat Pumps

Heat Recovery

Approximations to :

Displacement Ventilation

Dedicated OA Systems

Chilled Beams

Variable Flow Refrigerant Systems

Plant Equipment Control and Load Management

Equipment Performance Curves

 

 

Registration fees: $399 (Student price: $299)

Note: this class will be held subject to a minimum of 20 attendees
registering for the class. In the event that CGBF does not receive these
many registrations, it will have to re-schedule the class to a later date.
In this event, fully paid registered attendees will receive a full refund
through a check. Any questions please email: meera at cgbf.org

 

Register by clicking here (https://www.123signup.com/register?id=vfdpv)

 

 

 

  _____  

Note:
These electronic documents are provided by Burgess & Niple (B&N) as a
convenience to our clients.
The official document is available as a manually signed, initialed, or
sealed hard copy. If there is a discrepancy between electronic files and the
hard copies, the hard copies shall prevail.
It is our professional opinion that this electronic information provides
information current as of the date of its release. Any use of this
information is at the sole risk and liability of the user. The user is
responsible for updating information to reflect any changes in the
information following the preparation date of this transmittal.
The delivery of this information in electronic format is for the benefit of
the owner for whom the services have been performed. Nothing in the transfer
should be construed to provide any right to third parties to rely on the
information provided, or that the use of this information implies the review
and approval of Burgess & Niple.

_______________________________________________ Bldg-sim mailing list
http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org To
unsubscribe from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at ONEBUILDING.ORG 

-- 

Dr. Hussein Abaza, Assistant Professor

Construction Management Department 

SCHOOL OF ARCHITECTURE’

CIVIL ENGINEERING TECHNOLOGY

 And CONSTRUCTION

1100 South Marietta Parkway, Marietta, GA 30060-2896

Website:  <http://www.spsu.edu/cost> www.spsu.edu/cost  Tel: 678-915-3719
Fax: 678-915-4966

E-mail: ahussein at spsu.edu

 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110225/78204e4e/attachment-0002.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/jpeg
Size: 1226 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110225/78204e4e/attachment-0002.jpeg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 14532 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110225/78204e4e/attachment-0002.gif>


More information about the Bldg-sim mailing list