[Bldg-sim] ventilation schedules for PTAC vs central outside air AHUs?

James Hansen JHANSEN at ghtltd.com
Thu Jul 21 09:20:04 PDT 2011


I was curious if anyone knew whether the following is allowed in
accordance with Appendix G (and/or LEED):

 

If have a hotel where the baseline system is PTAC, and those units are
intended to be the source of ventilation air, I have to have the fans
run continuously per Appendix G.

 

If my proposed building has a central OA delivery system that introduces
OA directly to each room, can I have that system run continuously and
allow my FCUs in each hotel room to run intermittently?

 

Thanks for any advice!

 

GHT Limited
James Hansen, P.E., LEED AP
Senior Associate
1010 N. Glebe Road, Suite 200
Arlington, VA  22201-4749
703-243-1200 (office)

703-338-5754 (cell)
703-276-1376 (fax)

www.ghtltd.com <http://www.ghtltd.com/> 

 



The information contained in this communication is confidential, may be privileged, and is intended only for the use of the addressee.  It is the property of GHT Limited.  Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful.  If you have received this communication in error, please notify me immediately by return e-mail or by e-mail to ght at ghtltd.com, and destroy this communication and all copies thereof, including all attachments.  Thank you.



-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110721/b20f460a/attachment.htm>


More information about the Bldg-sim mailing list