[Bldg-sim] Vestibule Modeling

RobertWichert robert at wichert.org
Tue Jul 30 08:08:02 PDT 2013


I see that ASHRAE 90.1 requires a vestibule in most cases, but I don't 
know if it is modeled or if it is just mandatory.  It would seem to me 
that if it was modeled, showing compliance using modeling, without a 
vestibule, would be OK (you would make it up somewhere else in the 
envelope).  Does anybody know if the vestibule is modeled anywhere, and 
how to take it out or put it in?

Since LEED requires compliance with ASHRAE 90.1 Mandatory measures, this 
makes a vestibule a mandatory requirement unless I can model it with and 
without.  If this is even possible.

Otherwise we must put in a vestibule to comply with LEED.


Is this correct?  Does anybody have other thoughts or ideas?  We have a 
very efficient building, modeled without the vestibule in Climate Zone 
3B.  I would think that we could take a heating penalty and not install 
a vestibule AT EVERY DOOR.


I appreciate your thinking about this.



-- 
Robert Wichert P.Eng. LEED AP BD&C
+1 916 966 9060
FAX +1 916 966 9068







===============================================



More information about the Bldg-sim mailing list