Hi Qinpeng,
Cooling coil availability schedule can be used to make it unavailable.
From E+ IO Reference
Fan coil units can be 4-pipe or 2-pipe. For 4-pipe units there are 2
supply pipes and 2 return
pipes. For 2-pipe units there is a single supply pipe and a single
return pipe and the supply is
switched between hot and chilled water depending on the season. We model
4-pipe units, but
the 4-pipe model can be used to model 2-pipe units by using the coil
availability schedules to
make sure that either hot or chilled water is exclusively available.
Thanks,
Chandan
On 5/20/2013 4:01 PM, Qinpeng Wang wrote:
>
> Hi All,
>
> I have a question regarding EnergyPlus HVAC system modeling:
>
> How to model a 2 pipe FCU/UV in EnergyPlus because it seems to require
> that I specify a cooling coil name which I don't have (I don't have a
> cooling plant)?
>
> Thanks!
>
> --
>
> Qinpeng Wang, PhD Student
>
> College of Architecture
>
> Georgia Institute of Technology
>
> Atlanta, GA 30332-0155
>
>
>
> _______________________________________________
> Bldg-sim mailing list
> http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org
> To unsubscribe from this mailing list send a blank message to BLDG-SIM-UNSUBSCRIBE at ONEBUILDING.ORG
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20130520/693d8b4f/attachment-0002.htm>
More information about the Bldg-sim
mailing list