[EnergyPlus_Support] Main Branch Cooling Coil and Heating Coil Control Nodes



Hello all,

I am getting max iterations on a loop  and I'm trying to go through 
the file iteratively to locate the source of the problem (node 
connections, correct flowrates etc). 

A brief description of the system I am trying to emulate:

I have a fixed flow system. The AHU takes full fresh air before 
entering a cooling coil, a heating coil and a supply fan (no 
reheat). The temperature leaving the supply fan is varied according 
to zone temperature.

What I have done:

I have two Controller:simple objects which both use the same control 
node (the supply fan outlet node). I have set this at 18oC. However, 
I would prefer to let EnergyPlus decide what the setpoint should be.

Could this be the source of my problems?

Kind regards

-Elmer





The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are not allowed -- please post any files to the appropriate folder in the Files area of the Support Web Site.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.idf and press the "search" button.
 
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/

<*> To unsubscribe from this group, send an email to:
    EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/