[Equest-users] VAV in eQuest

Marcus Eliason meliason at essexco.com
Thu Oct 16 14:26:06 PDT 2008


Hello,

I am working on modeling the HVAC system of large office building.  The
building has a central air handler per floor with chilled water coils, VAV
for core areas and PIUs with electric heat for the perimeter areas.  In the
wizard, I have specified the system as "Parallel VAV with electric reheat"
as well as specified the heating capacity of the system.  Once in the detail
mode, I have gone through the zone terminal and specified the terminal type
for core areas as STD VAV instead of Parallel PIU. (coincidently, eQuest did
not like it when I specified system as "Standard VAV with electric reheat"
and tried to modify all the perimeter zones to Parallel PIU)  Once
simulated, the detailed reports indicate that my core areas (VAV) do not
have enough heating capacity.  Furthermore, eQuest reports a large amount of
unmet heating load hours.  Can someone explain to me why eQuest wants a
heating capacity for the core zones, when in reality, the VAV for the core
has no heating, just modulation of cool air into the space?  Has anybody
else dealt with this issue and might be able to lead me to a better
solution.  I have attached the .pd2 and .inp files for reference.  Thanks
for all your help.


Marcus Eliason, LEED AP
Essex Engineering Corporation
404.365.9482
meliason at essexco.com

-------------- next part --------------
A non-text attachment was scrubbed...
Name: Building Model.pd2
Type: application/octet-stream
Size: 83772 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20081016/f1384913/attachment.obj>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Building Model.inp
Type: application/octet-stream
Size: 1150085 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20081016/f1384913/attachment-0001.obj>


More information about the Equest-users mailing list