[Equest-users] Top 10 Improvements

Brian Fountain bfountain at greensim.com
Tue Sep 9 18:26:31 PDT 2008


Great list!

One addition would be to fix the issue where roofs are created on lower 
shells immediately below upper shells.



Eric Shadd wrote:
> I would like to put forth a list of improvements to eQUEST.  I'm 
> posting in just in off chance others might want to add and/or vote.  
> (Marlin Addison in his classes always mentions that they need more 
> user feedback for improvements).
>  
> 1.  The ability to create, leave out, or reassign keywords/components 
> in parametric runs. 
>  
> This would fix at least 2 things:
>  
> a.  The glaring difficulty of creating 90.1 App G baselines when the 
> proposed design has a chiller, but the baseline has packaged cooling.  
> For me, this is the #1 shortcoming in eQUEST.  Encountered all the 
> time, tedious and error-prone every time.
> b.  Zones could be reassigned between runs.
>  
> Right now, we solve this by abandoning eQUEST before doing parametrics 
> and using if-then statements in the INP and then using "case" type 
> statements to change them in the BDL.
>  
> 2.  Fixing the spreadsheets so that they cut/paste can be used with 
> Excel and Word, and so that multiple selections can be more easily 
> edited at once.  Also I think the spreadsheet locks cells when sorted 
> sometimes.
>  
> 3.  A graphical and spreadsheet format for schedules in the detailed 
> interface.  Would streamline a tedious process and provide output for 
> reports. 
>  
> 4.  The ability to copy/paste components within the tree structure 
> (right now have to use a pulldown menu to find the space).
>  
> 5.  A detailed interface zone/space editor that makes it easier to 
> create, modify, or delete zones or spaces (not only helps w/updating 
> the geometry, but for displacement ventilation too).
>  
> 6.  Updating the help menus to refer directly to eQUEST user inputs.  
> Right now the DOE2 help will only tell you the keyword/command, but 
> not where to find them in eQUEST's detailed interface.
>  
> 7.  Change the Zone Snap by CAD, Polygon, or Grid in the wizard to 
> radio buttons instead of pulldown menus (I find it useful to switch 
> between these somewhat often during zoning).
>  
> 8.  A feature to show if an entry is default, where it comes from 
> (Title 24?  DOE2?  90.1? 62.1? Standard practice?)
>  
> 9.  The ability to copy/paste parametric components and runs.  Right 
> now can be done in the .prd, but errors possible.
>  
> 10.  Azimuth field in the Window spreadsheet so that it can be sorted 
> by orientation.
>  
> 11.  Several things are missing from the parametric run pulldowns 
> (e.g. Tubular skylights, Lighting Control Method).
>  
> 12.  Making Savings by Design runs possible on the Baseline model, not 
> just parametric runs.
>  
> -Eric
>  
>  
> ------------------------------------------------------------------------
>
> _______________________________________________
> Equest-users mailing list
> http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
> To unsubscribe from this mailing list send  a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
>   
> ------------------------------------------------------------------------
>
> No virus found in this incoming message.
> Checked by AVG. 
> Version: 7.5.524 / Virus Database: 270.6.19/1659 - Release Date: 9/8/2008 7:01 AM
>   

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20080909/bc909a3b/attachment-0001.htm>


More information about the Equest-users mailing list