Hi all,

 

I am performing an energy model for a couple buildings with a central
plant and LEED's treatment of district thermal energy says the upstream
(i.e. plant) equipment cannot be included in the prerequisite
calculation.  I have already set up the model and got it going for the
Energy credit with water-cooled chillers and steam fired boilers.  In
order to do the prereq, I have added a steam meter to the HHW loop and a
chilled water meter to the CHW loop.  When I perform compliance
analysis, I get an error stating there is no point in having plant
equipment if the loop in on the meter.  When I delete chillers and
boilers, pumps, and tower - it has errors sizing the equipment.

 

Can anyone offer up advice or point me to a document that explains
clearly the best method?  Thank you.

 

Amber Welsh, P.E. | Associate
LEED(r) Accredited Professional

 
397 5th Street NE,

Atlanta, GA 30308 
(v) 404.810.9020
(c) 678.488.1967
timmonsdesigneng.com <http://timmonsdesigneng.com/>  

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100809/2b526812/attachment.htm>


More information about the Equest-users mailing list