[Equest-users] Sizing Issue Denver Vs Miami

Austin Hermsen ahermsen at enermodal.com
Tue Jun 29 11:04:25 PDT 2010


I am having an issue with equipment sizing. I am running a simple office
building in Denver and Miami. Despite having a much higher peak cooling load
in Miami eQuest is sizing the chiller plant larger in Denver. Does anyone
know why eQuest would be drastically over sizing equipment in Denver or can
someone shed more light on the eQuest sizing calculation. Peak cooling load
from SS-D report 534 (Denver), 934 (Miami). Rated capacity of chillers from
PV-A 1029 (Denver), 1024 (Miami). Everything is autosizing.