[Equest-users] GSHP with 3.61 and 3.63b. PV power usage

Varkie C Thomas thomasv at iit.edu
Thu Mar 4 12:44:07 PST 2010


I tried to run 3,63b with a GSHP input file that ran with 3.61.  I got the following caution and error messages shown below and the SIM reports stopped after loads.  The BDL file shows that the program ran all the way through with no error messages.  How do I fix the input for 3.63b so that this 3.61 input file runs?
 **CAUTION**********************************************************************
             In curve: CYCLING-PUMP                     the dependent value
             is exceeding the limits.
             Value/Min/Max/First time:          1.015          0.020          1.000   1/ 2/ 8
 
 ***ERROR***********************************************************************
             Ground-loop HX: GROUND-HX-1                     
             is undersized for the load and is producing an extreme
             temperature of   -12F.  Mon/Day/Hr:  1/ 2/ 8
 
How does eQUEST distribute the PV generated power to lights, equipment, cooling, pumps & fans in the BEPS report?  Can the details be viewed in one of the other reports
Varkie
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20100304/e40a79dd/attachment.htm>


More information about the Equest-users mailing list