I'm trying to model a small commercial building with a changeover bypass 
system. What I mean is each zone would have it's own damper, but they 
would not have reheat. When a certain percentage of zones needed heating 
or cooling, the system would changeover to condition those zones, then 
change back, etc. The zone dampers would just open and close based on a 
need for the air being supplied, closing down to a minimum to maintain 
outdoor air requirements. I'm looking at the PVVT system, but it sounds 
like that system is only controlled by one zone.

Also, how do you check to make sure dampers are closing when needed, 
etc. in the reports? I suppose you would have to make an hourly report 
for supply cfm, and compare that to the hours the zone is underheated or 
undercooled?

Thanks,

-- 
Dane Heimerman
HVAC Engineer
Michael L. Norris&  Associates, Inc.
270 Walker Dr, Suite 201B
State College, PA 16801
p:814.867.3823
f:814.867.4823
daneh at mlnai.com





More information about the Equest-users mailing list