[Equest-users] In Appendix G comparisons are air side economizers required in IDF/Electrical Rooms
Jansen, Connor
Connor.Jansen at wspfk.com
Tue Jul 12 13:04:29 PDT 2011
Hello All,
When performing a 90.1 2007 Appendix G energy model, the baseline system
for the building appears to call for a packaged single zone air handler
and an airside economizer for individual IDF and Electrical rooms. The
proposed systems are designed as FCUs. Although not addressed in
Appendix G, section 6.5.1, would appear to exempt the airside
economizers in rooms requiring a low cooling capacity.
With that said, is it correct to reference other parts of ASHRAE 90.1
(prescriptive path Sec 6.5) when performing a performance based Appendix
G energy cost comparison?
Your help and clarification would be much appreciated. I apologize if
this is not the correct forum for this post and would be greatly obliged
if you were to direct me to the correct forum.
Regards,
Connor
Connor Jansen, PE
Built Ecology Specialist
405 Howard Street
Suite 500
San Francisco CA 94105
T. +1 415 398 3833
D. +1 415 402 2721
F. +1 415 433 5311
E. connor.jansen at wspfk.com <mailto:connor.jansen at wspfk.com>
W. built-ecology.com <http://www.built-ecology.com/>
A specialist service of WSP Flack + Kurtz
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110712/4c20d765/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 2340 bytes
Desc: image001.gif
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110712/4c20d765/attachment.gif>
More information about the Equest-users
mailing list