[Equest-users] capacity smaller than secondary demand

冷面寒枪 503271081 at qq.com
Mon Dec 3 04:35:25 PST 2012


The Secondary number comes from the Loop design Load。you can see the PS-C report.




------------------ Original ------------------
From: "Shaun Martin"; 
Date: 2012年12月1日(星期六) 上午8:31
To: "equest-users"; 
Subject: [Equest-users] capacity smaller than secondary demand




Hi everyone, 

 

I’m working on a loop-to-loop heat pump model.  My hot water loop has a coil load of 231.8 kBtu/h, from the SS-D and PS-D reports.   To this loop, I have 710 kBtu/h of heat pumps and an 846 kBtu/h boiler attached, which reasonably matches the primary number.    

 

But, for some reason,  the message below is telling me my secondary load is 10x the size that it actually is!

 

**WARNING**********************************************************************

             Loop: Hot Water Loop       heating capacity is smaller

             than the secondary demand. Primary= -1537010.

              Secondary= -2291187.

 

Does anyone happen to know where this secondary number  actually comes from?

 

Thanks,

Shaun
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20121203/d82dc195/attachment.htm>


More information about the Equest-users mailing list