Dear Nathan

Thanks very Much for your help & for your informations & your simple explanation, really I appreciate it , I don't know how to thank u …… I will try as u told me, but I am sure it will be OK….
 
Also Thank u Thomas, & thanks for your file (really is important, but maybe I need time to study it very well)….thanks
 
My Regards,
Riad el Abed
Chief MEP, PQP
Tel  +96170 643977
 
DEC Consultants
Po Box 26330
Abu Dhabi
Tel +9712 4457505
Fax +9712 4457506
www.dec.ae
_____________________________________________________________________ 
DISCLAIMER
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error please notify the sender. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of DEC Consultants. Finally, although efforts were made to prevent virus transmission, the recipient should check this email and any attachments for the presence of viruses. DEC Consultants accepts no liability for any damage caused by any virus transmitted by this email.
 

 



From: nathanm at rushingco.com
To: riad_abed at hotmail.com; equest-users at lists.onebuilding.org
Subject: RE: [Equest-users] Infiltration & Whole Building air leakage ????
Date: Wed, 8 Feb 2012 07:44:17 -0800








This is one of those areas where the wizard is still useful. If you input infiltration in the DD wizard “Building Envelope Constructions” screen, it will automatically calculate infiltration based on exterior wall area (I’ve never checked to see if it includes exterior roof in the calculation as well, but it doesn’t appear so). 
 

 

 
Note that 0.4 CFM/SF is not the proper value to input here, because that is a high static pressure for testing purposes. In my local energy code, the following conversion factor is given:

 
If you have already left the wizard, you might want to save another copy of your project, go back into the wizard to play with the infiltration rates, and then use the spreadsheet view of Detailed Edit to copy and paste the infiltration rates the wizard calculates for you. This works well if you haven’t changed the order of the spaces or added many new spaces since you left the wizard. 
 
Sincerely, 
 

Nathan Miller, PE, LEED AP BD+C
Mechanical Engineer/Senior Energy Analyst
O 206-285-7100 | D 206-788-4577
www.rushingco.com
 


From: equest-users-bounces at lists.onebuilding.org [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of RIAD ABED
Sent: Wednesday, February 08, 2012 4:54 AM
To: equest-users at lists.onebuilding.org equest-users at lists.onebuilding.org
Subject: [Equest-users] Infiltration & Whole Building air leakage ????
 

Dear All e-Quest Users

Whole Building air leakage shall not exceed 0.4 CFM/ft² @ 0.3" w.g  (2 L/s/m² @ 75Pa) .
 
So if I consider whole Building air Leakage = 0.4 CFM/ft2 , How can I Express it in e-Quest , to calculate the Infiltration Value for each space in the Building , especially in Detailed mode ????
 
Note : in detailed mode for each Space , we have to put a data for Infiltration CFM/ft² , but ft² is  for floor area not building envelope area) ….please any help is very appreciated especially who have Big Experience please…thanks for all
 
My Regards,
Riad el Abed
Chief MEP , PQP
Tel  +96170 643977
 
DEC Consultants
Po Box 26330
Abu Dhabi
Tel +9712 4457505
Fax +9712 4457506
www.dec.ae
_____________________________________________________________________ 
DISCLAIMER
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error please notify the sender. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of DEC Consultants. Finally, although efforts were made to prevent virus transmission, the recipient should check this email and any attachments for the presence of viruses. DEC Consultants accepts no liability for any damage caused by any virus transmitted by this email. 		 	   		  
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20120208/c46202b9/attachment-0002.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.png
Type: image/png
Size: 33257 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20120208/c46202b9/attachment-0006.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.png
Type: image/png
Size: 14861 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20120208/c46202b9/attachment-0007.png>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.png
Type: image/png
Size: 54379 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20120208/c46202b9/attachment-0008.png>


More information about the Equest-users mailing list