[Equest-users] Some cases in eQuest modeling
Chris Jones
cj at enersave.ca
Mon Oct 8 07:59:20 PDT 2012
For the WSHP and RTU issue:
1. Create a "dummy space/zone". Set the design space/zone
temperature at the design supply air temperature of the RTU. Create
the RTU and assign this dummy zone to that new system.
2. In each WSHP zone, specify OA-FROM-SYSTEM to point to the RTU
serving the dummy zone. Not perfect but it works well enough for
most applications.
No comment on the other two issues.
>Dear Friends,
>
>Can you please guide me on following cases:
>
>1. In one Project We have different WSHP (Water Source heat
>Pump) units serving to three floors and there is one RTU which
>supplies ventilation air to WSHP units. I can model WSHP units in
>eQuest but how to model this RTU as it is not separate system?
>
>2. In other Project We have combination of three AHUs - with
>only Chilled water coils (Two working + One Stand by) and one
>Precoil unit with Chilled water coils which supplies fresh air to
>these set of AHUs. What I had done is modeled combined capacity of
>AHUs (with adding cfm of both AHUs) for the area served, but then
>here is also question; how to model precoil unit?
>
>3. We have Office areas which are served by AHUs as well as
>there is split AC in each office. as per my knowledge we can model
>only One HVAC system for single zone in eQuest or is there any other
>way where I can assign these systems and can model it?
>
>Thanks,
>
>Nimesh Prajapati
>
>>
Christopher Jones, P.Eng.
Suite 1801, 1 Yonge Street
Toronto, ON M5E1W7
Tel. 416-203-7465
Fax. 416-946-1005
email cj at enersave.ca
More information about the Equest-users