[Equest-users] Plant Loop Load & Design Parameters
赵永青
503271081 at qq.com
Wed Apr 24 01:34:30 PDT 2013
Ps-d report reflects actual demand .pv-a report reflects design condition.
--
这是通过Aico Mail手机客户端发送的邮件。Aico Mail旨在丰富人们的沟通与生活,提供全新的移动办公体验。
Jenny Zhang 写到:
Dear All friends what's the difference between the loop loads of PS-D circulation loop load and PV-A plant design parameters? I find there are slight difference between this two values. which one reflects the actual demand of system? And if I increase the sizing ratio, the latter one goes up simultaneously while the former one seems to have no change" Thanks in advanced. Jenny Zhang SHANGHAI/Bsus x88750 ____________________________________________________________ Electronic mail messages entering and leaving Arup business systems are scanned for acceptability of content and viruses _______________________________________________ Equest-users mailing list http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org To unsubscribe from this mailing list send a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20130424/e6b8d116/attachment-0002.htm>
More information about the Equest-users
mailing list