Hello Everyone,

I modeled a single eQuest model for 7 Building having central HVAC system.
As per the guideline under AGMBC (LEED application guide for Multiple
building and on-campus building projects), the EA prerequisite 2 says, Each
thermal energy source distributed to each project building must be
individually metered in the proposed case.
so as I know about eQuest, it can model chilled water meter and steam meter
to measure plant side chilled water generation and Hot water/steam
generation by the chiller and Boiler. Please correct me if I am wrong.
Now as per guideline, we have to model for each building a separate chilled
water meter and hot water meter. *How can we model separate chilled water
and hot water meter for each building to measure thermal energy source
distribute to each building?*
*
*
*Thank you,*
*
*
*Regards,,*
*
*
*Mayank Bhatnagar*
*
*
*Energy Analyst*
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20130111/18bc16e7/attachment.htm>


More information about the Equest-users mailing list