[Equest-users] GSHP with Displ. Vent. & Radiant/Baseboard

Brian Smith brians at murraypc.com
Wed Nov 6 17:27:07 PST 2013


Hey,

 

I'm try to model a Library that will use displacement ventilation being
supplied at about 64F and then the radiant/baseboard heat picking up to rest
of the load to 69F. Read through some eQuest design guides to model the
displacement ventilation to satisfactory results. I ultimately had to use a
PSZ system while I would have preferred to use a single zone reheat system
SZRH or better yet Const-Volume Reheat System RHFS i could make those not
error.  Any luck?

 

Here's my biggest problem though. . .

I used hot water baseboards to approximate the radiant:-(. Everything was
going well until it was decided that for this cost estimate we wanted to
model the system as having both the heating coil and radiant/baseboard hw as
being 100% supplied by the ground source HP system. I cant figure out that
at all? eQuest wants to put the baseboards on a hw loop and will error when
I try  to put it on a water loop heat pump loop.

 

Any experince or help with doing this would be great

 

Thanks

Brian Smith, Mechanical Design Engineer

Murray & Associates, P.C.

T/907.780.6151 F/907.780.6182

www.murraypc.com

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20131106/1c615213/attachment.htm>


More information about the Equest-users mailing list