Karen & David,
Thank you for your input on this topic. I tend to agree
with both of you about the intent but I would have a hard time pointing
to any specific text if anyone were to disagree with this
interpretation. The wording is a bit unclear. Pages 5 & 6 seem to simply
refer back to tables 2 & 3.
Good luck with your project Karen...
Eric
From: Karen Walkerman [mailto:kwalkerman at gmail.com]
Sent: Tuesday, September 09, 2008 12:08 PM
To: Eric Youngson
Cc: bldg-sim at lists.onebuilding.org; bldg-rate at lists.onebuilding.org
Subject: Re: [Bldg-sim] District Thermal System
I am also in the middle of a DES project at the moment. The way that I
interpreted Step 1 and 2 is as follows:
Step 1:
Baseline: all downstream (on-site) equipment, envelope components, etc,
as in Appendix G. heating and cooling is purchased from a DES system.
Proposed: all downstream (on-site) equipment, envelope components, etc,
as designed. Heating and cooling is purchased from a DES system.
Step 2:
Baseline: all equipment is modeled as on-site. Boilers and Chillers are
to be modeled as designed in Appendix G. Utility rates are to be local
utility rates
Proposed: building is to be modeled as built. Heating and cooling is
purchased from a DES system, energy costs must take into account DES
production and transmission losses.
In my opinion, the vocabulary in Table 1 is confusing, but the
guidelines on pages 5 and 6 seem pretty clear. Am I on the same page as
everyone else here?
Thanks,
--
Karen
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-rate-onebuilding.org/attachments/20080909/7a94ff2f/attachment-0002.htm>
More information about the Bldg-rate
mailing list