I have a DOE question for you. If I wanted to simulate the energy
consumption of a building that have negative process load, could I input a
negative process load to be considered in the buildings load calc? Maybe
there is a way to create a lighting system with negative wattage that
operates 24 hours per day or what ever the equivalent of the process load
is.
I am asking because I am trying to simulate a supermarket which has reduced
cooling load because the refrigeration systems provide cooling that is not
seen by the HVAC system.
Anyway, let me know what you think.
======================================================