I am setting up an eQuest sim with a bio-diesel generator used onsite to
reduce the load. I have an operation schedule defined by the electrical
engineer that is not 24/7. On page 342 of the DOE22Vol3-Topics manual there
is an example of a 12-hour surplus sale operation sequence that looks like
this:
Gen-DS = DAY-SCHEDULE-PD
TYPE = FLAG
VALUES = (0,0,0,0,0,5,5,5, $ 0=don't run
5,5,5,5,5,5,5,5, $ 5=maximum output
5,0,0,0,0,0,0,0) ..
I couldn't find any reference to the values used in the flag schedule. Does
"5" correspond to running at full capacity as defined in the
ELECTRIC-GENERATOR command? Would values from 0-5 then be part capacity
operation?
Thanks,
Bryce Munger
Balzhiser & Hubbard Engineers
Mechanical - Electrical - Civil - Energy - Lighting - Surveying -
Commissioning - Sustainability
100 West 13th Avenue, Eugene, Oregon 97401 (541) 686-8478 fax (541)
345-5303
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20050915/46427564/attachment.htm>
More information about the Bldg-sim
mailing list