[BLDG-SIM] Trombe Wall Modeling?

Jeff Haberl jeffhaberl at tees.tamus.edu
Sat Apr 22 14:59:31 PDT 2006


Don't forget Bob McFarland who did the PASOLE analysis. 

Jeff
BB 8=!  8=)  :=)  8=)  ;=)  8=)  8=(  8=)  :=')  8=)  8=)  8=? BB

Jeff S. Haberl, Ph.D., P.E.............................jhaberl at esl.tamu.edu

Professor......................................................Office Ph: 979-845-6507

Department of Architecture.......................Lab Ph: 979-845-6065 

Energy Systems Laboratory.......................FAX: 979-862-2457 

Texas A&M University..............................77843-3581

College Station, Texas, USA.......................URL: www-esl.tamu.edu

BB 8=/  8=)  :=)  8=)  ;=)  8=)  8=()  8=) 8=?  8=)  8=)  8= BB
 

-----Original Message-----
From: BLDG-SIM at gard.com
To: BLDG-SIM at gard.com
Sent: Fri Apr 21 10:37:55 2006
Subject: [BLDG-SIM] Trombe Wall Modeling?

I wanted to make sure that credit of the LCR/SSF method is also given to the co-author, Dennis Barley.
 
Jon McHugh

________________________________

From: BLDG-SIM at GARD.COM [mailto:BLDG-SIM at GARD.COM] On Behalf Of Vikram Sami
Sent: Friday, April 21, 2006 7:37 AM
To: BLDG-SIM at GARD.COM
Subject: [BLDG-SIM] Trombe Wall Modeling?


Morgan,
NREL has a program that could do this called Sunrel. I havent used it yet, but I am sure it would involve a learning curve. 
 
If you want a simple approximate idea of savings, you could use the LCR/SSF method devloped by Doug Balcomb. 
 
 
 

Vikram Sami, LEED AP 
Direct Phone 404-253-1466 | Direct Fax 404-253-1366 

LORD, AECK & SARGENT ARCHITECTURE
Responsive Design · Technological Expertise · Exceptional Service 
www.lordaecksargent.com 

 

________________________________

From: BLDG-SIM at GARD.COM [mailto:BLDG-SIM at GARD.COM] On Behalf Of Heater, Morgan B.
Sent: Thursday, April 20, 2006 7:05 PM
To: BLDG-SIM at GARD.COM
Subject: [BLDG-SIM] Trombe Wall Modeling?



Hi all – I’m looking at modeling a large solar chimney for pre-heating outside air.  It’s going to consist of an 8 story glazing wall set 3’ or so in front of a cement mass mall.  I’m hoping to find a simple way to approximate the savings in eQUEST.  I’m still in the design development phase of the project, so I don’t want to spend too much time on the model.  Does anyone have any advice?  Thanks.    

Morgan Heater           

 FLACK + KURTZ  

1417 Fourth Ave 206.342.9900 Main

Suite 400                                 Ext

Seattle, WA 98101       206.342.9901 Fax

http://www.flackandkurtz.com <http://www.flackandkurtz.com>     morgan.heater at sea.fk.com <mailto:morgan.heater at sea.fk.com> 

                                                                                                                

This e-mail may contain confidential and/or privileged information. 

If you are not the intended recipient (or have received this e-mail in error)

please notify the sender immediately and destroy this e-mail. 

Any unauthorized copying, disclosure or distribution of the material 

in this e-mail is strictly forbidden. 



==================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM


==================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM



==================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM



More information about the Bldg-sim mailing list