[BLDG-SIM] eQuest

Dillon, Mike Mike.Dillon at avistacorp.com
Fri Aug 11 10:45:08 PDT 2006


I'm trying to model a building that currently has 24-hour HVAC controls,
and am trying to create a parametric run (in DDE) that models a new
controls installation. Previously, I just created my model, ran the
simulation, then did a "save as" and manipulated the HVAC and HW Plant
Equipment Schedules in the wizards, and while this method is effective
in seeing the results, I would really like to run the parametric for
both the comparisons within the graphs and to utilize the life-cycle
cost feature in eQuest.

Thanks in advance.

Mike 

In addition: does anyone know how to insert skylights on a slightly
sloped roof?

Mike Dillon E.I.T.
DSM Engineering Technician
Avista Utilities
1411 E. Mission Avenue - MSC 15
Spokane, Washington 99202
Phone: 509.495.4260
Mobile: 509.270.6453
Fax: 509.777.6136
www.avistautilities.com



===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20060811/20292cd2/attachment-0002.htm>


More information about the Bldg-sim mailing list