[BLDG-SIM] Modeling Process Load

Sarathy Narasimhan sarathyn at energynpower.com
Wed Feb 22 11:11:21 PST 2006


I am modeling a hotel building on eQuest based on actual measured hourly
load data for chiller and boilers over the past few years. The way I am
modeling it is putting in the hourly load data as process load on the
chilled water and hot water loops. I have a dummy zone with no loads for
the air-side. The problem I am having by modeling it this way is the
chilled water temperature cannot be reset as there is process load
scheduled every hour of the year. Is there a way to move the process
load (as SOURCE-POWER) into the dummy zone and reset the CHW temperature
with the load in the zone? The issue I am having with doing that is the
additional air-side energy consumption for the dummy zone.

 

Thank you,

Sarathy Narasimhan


This email is covered by the Electronic Communications Privacy Act, 18 U.S.C.  $$2510-2521 and is legally priviliged.  This information is confidential information and is intended only for the use of the individual or entity named above.  If the reader of the message is not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited.



===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20060222/cf7a16b5/attachment.htm>


More information about the Bldg-sim mailing list