[bldg-sim] EnergyPlus - DOE
Liu, Xiaobing
xiaobing.liu at okstate.edu
Thu Jan 19 07:22:17 PST 2006
Is there any comparison between e+ and DOE 2 with regard to the accuracy of the predicted loads and energy consumption? I'm curious about the benefits (in terms of accuracy) obtained from simultaneously solving the building loads and HVAC systems.
Xiaobing
________________________________
From: bldg-sim at gard.com on behalf of Vämshi Goojé
Sent: Thu 1/19/2006 8:30 AM
To: bldg-sim at gard.com
Cc: bhandari at fenestration.com
Subject: [bldg-sim] EnergyPlus - DOE
Mahabir,
The extended run time in EPlus could be due to transient analysis vs. steady state in doe 2.
Vamshi
On 1/18/06, Mahabir Bhandari <bhandari at fenestration.com> wrote:
Brian,
I think one additional difference from uses' point of view, which is not reported in this report, is simulation run time. It seems EnergyPlus takes 5-10 times longer to complete a whole year simulations than DOE2. I was running a simple 5 story building with VAV system and it took me more than 40 minutes for annual hourly simulations (1 hr time step) in EnergyPlus while eQuest could run the same building in less than 5 minutes. I am interested in hearing from others on the run time issue.
Mahabir Bhandari
________________________________
From: Brian Fountain [mailto:bfountain at greensim.com]
Sent: Wednesday, January 18, 2006 12:12 PM
To: bldg-sim at gard.com
Subject: [bldg-sim] EnergyPlus - DOE
That is a big question.
For a comparison of current energy simulation software, you could look at Dru Crawley's paper comparing 20 tools:
http://www.energytoolsdirectory.gov/pdfs/contrasting_the_capabilities_of_building_energy_performance_simulation_programs_v1.0.pdf
Main differences between DOE and EnergyPlus:
1) DOE calculates the space loads for each hour then calculates the system and plant response for each hour. EnergyPlus simultaneously solves the loads the system/plant response for each timestep.
2) DOE has a fixed 1 hour timestep, EnergyPlus has a variable timestep (down to 1 minute?).
3) There are also key issues with the weighting factor assumptions, the wall convective coefficients.
I haven't used EnergyPlus much yet. What did I miss guys?
Brian Fountain
-----Original Message-----
From: bldg-sim at gard.com [mailto:bldg-sim at gard.com] On Behalf Of Renato Sousa
Sent: January 18, 2006 10:56 AM
To: bldg-sim at gard.com
Subject: [bldg-sim] EnergyPlus - DOE
Hello everybody.
I would like to know if anybody has experience on using both EnergyPlus and DOE.
Currently I'm using an interface for EnergyPlus. From the software description I couldn't find out the main differences between EnergyPlus and DOE. Does anyone know the main differences or where can I find them?
From the description it is said that EnergyPlus was based on DOE and BLAST so I suppose EnergyPlus has some extra features but I'm not sure if that is right.
Best regards,
Renato Sousa
Tel: +351 919 316 221 | E-mail: renato.sousa at fluidinova.pt <mailto:renato.sousa at fluidinova.pt>
___________________________________________________
FluidInova, Engenharia de Fluidos, SA
TECMAIA - Parque de Ci?ncia e Tecnologia da Maia
Rua Eng? Frederico Ulrich, n? 2650 | 4470-605 Moreira da Maia | Portugal
Tel: +351 229 408 265 | Fax: +351 229 408 266
E-mail: geral at fluidinova.pt <mailto:geral at fluidinova.pt> | Web: www.fluidinova.pt/
==================
You received this e-mail because you are subscribed
to the
BLDG-SIM at GARD.COM <mailto:BLDG-SIM at GARD.COM> mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM <mailto:BLDG-SIM-UNSUBSCRIBE at GARD.COM>
==================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM
mailing list.? To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
--
Vämshi Goojé
===========================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20060119/37f3d681/attachment-0002.htm>
More information about the Bldg-sim
mailing list