[bldg-sim] PVVT Sytems with zone voting control
Allison Rutter
arutter at staenglengineering.com
Wed Jan 17 06:47:22 PST 2007
Hi all,
Has anyone used eQUEST to model a PVVT system with zone voting control? It
seems that I am only able to specify a control zone, and have all other
zones be "proportionate to the airflow of the control zone", whose
thermostats have no effect on the operation of the supply
airflow/temperature. Is there a way in which I can simulate the intended
system by specifying another system type in eQUEST, or by specifying a
cooling/heating availability schedule? Any help would be appreciated.
Thank you,
Allison Rutter
Mechanical Engineer, LEED AP
STAENGL ENGINEERING
300 W. Main St. Suite 302
Charlottesville, VA 22903
Ph: (434) 295-8105
Fax: (866) 810-2879
www.staenglengineering.com
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20070117/2c4d3139/attachment.htm>
More information about the Bldg-sim
mailing list