Hi,
I am using Equest to answer some SD level design questions about a LEED
building. I created a simplified model of the proposed development. I then
saved this model under a new project and file name, and made changes to
create the ASHRAE 90.1 baseline version of this model. Now, when I run the
baseline model, the Monthly Energy Consumption by Enduse report does not
include electric energy consumption. I have looked through all of the
electric equipment in the model, and it all seems to be connected to the
single electric meter in the project. Any ideas what may be causing this?
Thanks,
Lagan Todd
Project Engineer
Demand Management Institute
35 Walnut St
Wellesley, MA 02481
781-431-1100 ext. 16
781-431-1109 fax
_____
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20070731/ddf3d22f/attachment.htm>
More information about the Bldg-sim
mailing list