[Bldg-sim] Fossil/Electric hybrid system under 90.1 App G

James Hansen JHANSEN at ghtltd.com
Mon Nov 3 08:32:16 PST 2008


I can't seem to find reference to this in the 90.1 User Manual.  

 

In Appendix G, Table G3.1.1A, there is a reference to a Fossil/Electric
hybrid for determining Baseline system type.  Is this a system that, for
example, might have a gas-fired RTU with electric VAV boxes? 

 

In other words, if there is ANY gas heat in your Proposed building, your
Baseline building would have to automatically default to a fuel furnace
or gas-fired hot water heating system, correct?

 

Thanks,

 

GHT Limited
James Hansen, PE, LEED AP

Senior Associate

1010 N. Glebe Rd, Suite 200

Arlington, VA  22201-4749

703-338-5754 (Cell)

703-243-1200 (Office)

703-276-1376 (Fax)

www.ghtltd.com <http://www.ghtltd.com/> 


The information contained in this communication is confidential, may be privileged, and is intended only for the use of the addressee.  It is the property of GHT Limited.  Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful.  If you have received this communication in error, please notify me immediately by return e-mail or by e-mail to ght at ghtltd.com, and destroy this communication and all copies thereof, including all attachments.  Thank you.



-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20081103/ec17ace7/attachment.htm>


More information about the Bldg-sim mailing list