[Bldg-sim] Process Load Points Allowance
Marcus Sheffer
sheffer at energyopportunities.com
Fri Dec 4 06:51:26 PST 2009
The only notice was posted within the CIR which was partially changed.
There is no maximum. Projects are eligible for as many EAc1 points as are
available.
Marcus Sheffer, Chair EA TAG
From: bldg-sim-bounces at lists.onebuilding.org
[mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Kevin Kyte
Sent: Friday, December 04, 2009 9:26 AM
To: bldg-rate at lists.onebuilding.org
Cc: bldg-sim at lists.onebuilding.org
Subject: [Bldg-sim] Process Load Points Allowance
At USGBC.org, a CIR submitted 5/26/09 approvingly says that now projects are
eligible to claim more than 4 points EA1 Credit through process energy
efficiency savings and references a date 10/15/09. I am unable to find any
document with this date.
Is this notice posted somewhere other than the CIR page?
What is the new maximum EA1 point eligibility for process energy efficiency
savings?
Thank you,
Kevin Kyte, LEED ® AP
Watts Architecture & Engineering, P.C.
95 Perry Street, Suite 300
Buffalo, NY 14203
p: 716.206.5174
f.: 716.206.5199
e: kkyte at watts-ae.com
http://www.watts-ae.com <http://www.watts-ae.com/>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20091204/41a0900f/attachment-0002.htm>
More information about the Bldg-sim
mailing list