Hey Nick:

 

The baseline for building envelope is 90.1-2001.  Construct your building as
built to that standard and calculate usage.  Your 50% (or whatever
percentage) savings is calculated based upon energy usage reduction
generated beyond that baseline not your actual building. 

 

Thanks,

 

Andy 

 

Andy Hoover

Principal

The BEST Consultant, Inc.

Office: 678-200-7648

Fax:678-827-0574

Cell: 678-793-1159

 

www.thebestconsultant.com

 

 

  _____  

This message may contain confidential and/or privileged information. If you
are not the addressee or authorized to receive this information for the
addressee, you must not use, copy, disclose, or take any action based on
this message or information herein. If you have received this message in
error, please advise the sender immediately by reply e-mail and delete this
message. Thank you for your cooperation.

  _____  

From: bldg-sim-bounces at lists.onebuilding.org
[mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Nick Anderson
Sent: Tuesday, January 06, 2009 4:18 PM
To: bldg-sim at lists.onebuilding.org
Subject: [Bldg-sim] EPACT Simulations Questions

 

Building simulations for EPACT credits require that the building energy and
power costs be reduced by 50%.  The tax credit has been extended to 2013.

 

The energy and power cost savings must come from a 16-2/3% reduction in
three categories: Building envelope, HVAC and SHW, and Lighting.  There is a
guideline called  "Energy Savings Modeling and Inspection Guidelines for
Commercial Building Federal Tax Deductions" Second Edition, which is
Technical Report NREL/TP-550-40467, May 2007.  

 

In this guideline, they describe the technique on pages 3 and 4 to calculate
the costs and % cost reductions due to the Lighting, and HVAC/DHW
electricity use.  Nowhere does it describe how they want you to calculate
the cost and cost reductions due to the building envelope, despite the fact
that 16-2/3% of the energy savings are required to come from this category.

 

Does anybody know what to do for the building envelope and the EPACT
deduction?  

 

Has anyone seen a spreadsheet available already created to do the cost
allocations based on the outputs from a simulation program (in my case Trane
Trace 700)?  There are quite a few available for the simple "Interim
Lighting Rule" but none that I have found for the full model.

 

Also, in April 2008, an IRS Notice 2008-40 called "Amplification of Notice
2006-52" describes being allowed to change the portion of the savings for
the building envelope to 10% if the Lighting and HVAC/DHW savings are
increased to 20% each (for a total remaining at 50% energy and power cost
reduction).

 

Has anybody seen this used?  I have searched around for examples of EPACT
and all places still reference the 16-2/3% thresholds.

 

 

 

Nick Anderson

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20090107/40dcbc27/attachment-0001.htm>


More information about the Bldg-sim mailing list