[Bldg-sim] modeling baseboard in 90.1-2007

Will Mak wmak at epsteinglobal.com
Mon Feb 28 12:47:47 PST 2011


Hello all,

 

I was trying to find some guidance on how we are suppose to model baseboard systems on the baseline model for LEED submission. Are they treated like preheat systems where we must simulate them to be the same on both the proposed and baseline or is there some rule I'm not seeing in ASHRAE 90.1-2007?

 

Thanks!

 

William Mak, LEED Green Associate
Mechanical Design Engineer

EPSTEIN
Architecture
Interiors
Engineering
Construction

600 West Fulton Street
Chicago, Illinois 60661-1259

D: (312) 429-8116
F: (312) 559-1217
E: wmak at epsteinglobal.com <mailto:wmak at epsteinglobal.com> 
W: www.epsteinglobal.com <http://www.epsteinglobal.com/> 

þ Epstein is a firm believer in sustainability. We ask that you please consider the environment before printing this e-mail.

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110228/143dae13/attachment.htm>


More information about the Bldg-sim mailing list