[Bldg-sim] High equipment building

Rathna Shree rathnashreep at yahoo.in
Sun Dec 9 22:49:32 PST 2012


Dear all,


The project
is a 67000 sqft, six floored building. There are rooms with high equipment
loads of greater than 20W/sft . The total area of these type of rooms adds up
to 14,000 sqft. These high equipment rooms are 24x7 operating. We have modeled
baseline case considering PSZ-HP in all these rooms as per G3.1.1b. The other
spaces (office spaces) are modeled with VAV-PFP boxes. Is the
approach correct?

Thanks and Regards,
Rathnashree
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20121210/ace743d2/attachment.htm>


More information about the Bldg-sim mailing list