[EnergyPlus_Support] Water Heater Question



Hello all,

Is it possible to link a water heater with a boiler cicuit (which is 
additionally heated via an electric internal unit) and then schedule 
the use as seen below...

WATER HEATER:MIXED,
    J5,                      !- Name
    0.5,                     !- Tank Volume {m3}
    Hsched:1,                !- Setpoint Temperature Schedule
    ,                        !- Deadband Temperature Difference 
{deltaC}
    80,                      !- Maximum Temperature Limit {C}
    CYCLE,                !- Heater Control Type
    5000,                    !- Heater Maximum Capacity {W}
    0,                       !- Heater Minimum Capacity {W}
    ,                        !- Heater Ignition Minimum Flow Rate 
{m3/s}
    ,                        !- Heater Ignition Delay {s}
    Electricity,             !- Heater Fuel Type
    1,                       !- Heater Thermal Efficiency
    ,                        !- Part Load Factor Curve
    0,                       !- Off-Cycle Parasitic Fuel Consumption 
Rate {W}
    Electricity,             !- Off-Cycle Parasitic Fuel Type
    0,                       !- Off-Cycle Parasitic Heat Fraction To 
Tank
    0,                       !- On-Cycle Parasitic Fuel Consumption 
Rate {W}
    Electricity,             !- On-Cycle Parasitic Fuel Type
    0,                       !- On-Cycle Parasitic Heat Fraction To 
Tank
    SCHEDULE,                !- Ambient Temperature Indicator
    Hsched:2,                !- Ambient Temperature Schedule
    ,                        !- Ambient Temperature Zone
    0,                       !- Off-Cycle Loss Coefficient To 
Ambient Temperature {W/K}
    ,                        !- Off-Cycle Loss Fraction To Zone
    0,                       !- On-Cycle Loss Coefficient To Ambient 
Temperature {W/K}
    ,                        !- On-Cycle Loss Fraction To Zone
    1.111111E-06,            !- Peak Volumetric Use Flow Rate {m3/s}
    HWSschdule:J5,           !- Use Flow Rate Fraction Schedule
    Hsched:3,                !- Cold Water Supply Temperature 
Schedule
    ,                        !- Use Side Inlet Node
    ,                        !- Use Side Outlet Node
    1.0,                     !- Use Side Effectiveness
    J5:Pin,                  !- Source Side Inlet Node
    J5:Pout,                 !- Source Side Outlet Node
    1.0;                     !- Source Side Effectiveness

I am having problems with my configuration. I tried using a DHW unit 
on the use side however I still recieve zero loads. Can anyone see 
something that I may be missing?

Kind regards

-Elmer






------------------------ Yahoo! Groups Sponsor --------------------~--> 
Get to your groups with one click. Know instantly when new email arrives
http://us.click.yahoo.com/.7bhrC/MGxNAA/yQLSAA/dkFolB/TM
--------------------------------------------------------------------~-> 

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are not allowed -- please post any files to the appropriate folder in the Files area of the Support Web Site.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.idf and press the "search" button.
 
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/

<*> To unsubscribe from this group, send an email to:
    EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/