__._,_.___
Yes. It's for the expected airflow path through the facade, which could differ from the overall height of the cavity (hence the separate input).
But if the upper and lower joint openings aren't equal, then the neutral pressure level might be shifted away from the midpoint.
From: EnergyPlus_Support@xxxxxxxxxxxxxxx [mailto:EnergyPlus_Support@xxxxxxxxxxxxxxx] On Behalf Of josep.sole@xxxxxxxxxxx
Sent: Tuesday, October 07, 2008 1:40 PMSubject: RE: [EnergyPlus_Support] ventilated facades
When the external pane is open joints is better to considerer the half height between joints?
Josep Solé
URSA Ibérica Aislantes SA - URALITA
Dirección Técnica
C/ caspe nº 17 6ï??Planta
08010 - Bareclona - España
Tel +34 344 11 00
Tel IP +34 93 344 11 36
Móvil +34 606 42 32 14
Fax +34 344 11 00
P URALITA / URSA se compromete con el ahorro de energÃa. Antes de imprimir este mensaje asegúrese de que es necesario.
Aviso de confidencialidad
Este mensaje contiene información que puede ser confidencial y de uso restringido. Si usted no es el receptor deseado del mensaje (ni está autorizado a recibirlo por éste) no está autorizado a copiar, reenviar, o por otra parte, divulgar el mensaje o su contenido a cualquier otro. Si ha recibido este mensaje por error, por favor, notifÃquenoslo inmediatamente y bórrelo de su sistema.
De: EnergyPlus_Support@xxxxxxxxxxxxxxx [mailto:EnergyPlus_Support@xxxxxxxxxxxxxxx] En nombre de Griffith, Brent
Enviado el: martes, 07 de octubre de 2008 19:20
Para: EnergyPlus_Support@xxxxxxxxxxxxxxx
Asunto: RE: [EnergyPlus_Support] ventilated facades
This is the height scale for buoyancy-driven ventilation. It is usually the overall height of the cavity's airflow path (in z-direction) divided by 2.
From: EnergyPlus_Support@xxxxxxxxxxxxxxx [mailto:EnergyPlus_Support@xxxxxxxxxxxxxxx] On Behalf Of Catarina Carvalhal
Sent: Tuesday, October 07, 2008 3:50 AM
To: EnergyPlus_Support@xxxxxxxxxxxxxxx
Subject: [EnergyPlus_Support] ventilated facades
Hi,
Can anyone tell me how a can calculate the value of the height from midpoint of lower opening to the Neutral Pressure Level (Î?HNPL) to input in the program ?
Thanks,
Catarina Carvalhal
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are not allowed -- please post any files to the appropriate folder in the Files area of the Support Web Site.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe
__,_._,___ Content-Type: image/gif; name=image001.gif Content-ID:X-Attachment-Id: 0.1 Embedded Content: image00172.gif: 00000001,0cf13889,00000000,00000000
- Follow-Ups:
- RE: [EnergyPlus_Support] ventilated facades
- From: Griffith, Brent
- References:
- RE: [EnergyPlus_Support] ventilated facades
- From: josep.sole
- RE: [EnergyPlus_Support] ventilated facades
- From: Griffith, Brent
- Prev by Date: RE: [EnergyPlus_Support] ventilated facades
- Next by Date: RE: [EnergyPlus_Support] ventilated facades
- Previous by thread: RE: [EnergyPlus_Support] ventilated facades
- Next by thread: RE: [EnergyPlus_Support] ventilated facades
- Index(es):