[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] there are some errors in my simulation but the result was still displayed



Look for the object "Zone Equipment List", the one with the name 
Zone1Equipment. The message says to look at line 1982 of your input 
file. You should have at least 5 entries for this object. The message is 
telling you that the 5th input (N2 , \field Heating Priority 1) is 
blank. Enter an integer in this field.

You can open the audit file (*.audit) and see how this input field was 
handled for your simulation.

ZONE EQUIPMENT LIST,
  A1 , \field Name
  A2 , \field KEY--Zone Equipment Type 1
  A3 , \field Type Name 1
  N1 , \field Cooling Priority 1
  N2 , \field Heating Priority 1   <<<<<<<<<<<<<<<<


yangchen19851226 wrote:
>
>
> Hi,
> There are some errors in my simulation but the result was still 
> displayed.I don't what's the reason?
> Listed is my error tips:
>
> Program Version,EnergyPlus 2.2.0.023, 2009-4-23 23:15,IDD_Version 
> 2.2.0.023
> ** Severe ** IP: IDF line~1982 Object=ZONE EQUIPMENT LIST, 
> name=ZONE1EQUIPMENT, Required Field=[Heating Priority 1] was blank.
> ** Warning ** IP: Note -- Some missing fields have been filled with 
> defaults. See the audit output file for details.
> ** Severe ** IP: Possible incorrect IDD File
> ** ~~~ ** IDD Version:"IDD_Version 2.2.0.023"
> ** ~~~ ** Possible Invalid Numerics or other problems
> ** Fatal ** IP: Errors occurred on processing IDF file. Preceding 
> condition(s) cause termination.
> ...Summary of Errors that led to program termination:
> ..... Reference severe error count=2
> ..... Last severe error=IP: Possible incorrect IDD File
> ************* Warning: Node connection errors not checked - most 
> system input has not been read (see previous warning).
> ************* Fatal error -- final processing. Program exited before 
> simulations began. See previous error messages.
> ************* EnergyPlus Terminated--Fatal Error Detected. 1 Warning; 
> 2 Severe Errors; Elapsed Time=00hr 00min 2.95sec
>
>
> 

-- 
Richard A. Raustad
Senior Research Engineer
Florida Solar Energy Center
University of Central Florida
1679 Clearlake Road
Cocoa, FL  32922-5703
Phone:   (321) 638-1454
Fax:     (321) 638-1439 or 1010
Visit our web site at: http://www.fsec.ucf.edu

UCF - From Promise to Prominence: Celebrating 40 Years



------------------------------------

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are not allowed -- please post any files to the appropriate folder in the Files area of the Support Web Site.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/EnergyPlus_Support/join
    (Yahoo! ID required)

<*> To change settings via email:
    mailto:EnergyPlus_Support-digest@xxxxxxxxxxxxxxx 
    mailto:EnergyPlus_Support-fullfeatured@xxxxxxxxxxxxxxx

<*> To unsubscribe from this group, send an email to:
    EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/