I´m trying to attemp the following Plant Lay-out with multiple pumps like this:- PlantLoopConnection 1Demmand Side (Boiller) -----> Suupply Side -Splitter -- PlantLoopConnection 2--Mixer....
- PlantLoopConnection n-Final Reciver 1Demmand Side ( PlantLoopConnection n) ---> Suupply Side - Splitter -- Final Reciver 2--Mixer...
-Final Reciver nEatch PlantLoopConnectio is for a different building.Thank You Once AgainMN
From: Edwin Lee <leeed2001@xxxxxxxxx>
To: EnergyPlus_Support@xxxxxxxxxxxxxxx
Sent: Wed, December 16, 2009 8:05:09 PM
Subject: Re: [EnergyPlus_Support] plantLoopConnection:Controlled
The PlantLoopConnection components are obselete and are being replaced by the common pipe. The two way common pipe attempts to allow control of a second node temperature in addition to the supply outlet (such as the supply inlet or the demand inlet). What type of nesting are you trying to attempt exactly?
Edwin LeeEnergyPlus Development Team
On Fri, Dec 11, 2009 at 05:14, Mário <m_neves32@yahoo. com> wrote:
Hello to Everyone
Can we create a system in with we have a primary loop with multiple plantLoopConnection :Controlled componetes on the supply side with the use of spliters and mixers. This would one level nesting of multiple plantLoopConnection :Controlled components?
Thank You
MN
__._,_.___
Attachment not found: d:\eudora\attach\NestedPlantCCs.jpg