hello, I downloaded the software xEsoView. When
using it, notice that the date of the simulation was 1998, not 2009 that
is for the dates you've scheduled. The analysis I do from November to December
2009 and looking at the timetable of 1998 finds that the days of the
months are the same, ie the first of November 1998 falls on a Sunday as
in the year 2009 . Please
help me podrian actulizar date during the simulation.