[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] help xEsoView





hello, I downloaded the software xEsoView. When using it, notice that the date of the simulation was 1998, not 2009 that is for the dates you've scheduled. The analysis I do from November to December 2009 and looking at the timetable of 1998 finds that the days of the months are the same, ie the first of November 1998 falls on a Sunday as in the year 2009 .
Please help me podrian actulizar date during the simulation.

Thanks


José Luis


__._,_.___


The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___